Non Woven Geotextile Staple/Short Fiber Needle Punched Nonwoven Geotextile Supplier PP PET Geotextile Fabric Slope Protection
Polypropylene non woven geotextile is made from high-strength polypropylene short fiber by non woven needle punched manufacturing process. It has separation, filtration, drainage, reinforcement, protection and maintenance etc. PET non-woven geotextile is made from PP short fiber by non-woven needle punched manufacturing process, it has isolation,filtration, drainage, reinforcement, protection and maintenance function.
Elongation corresponding to standard breaking strength (%)
20-100
CBR Bursting strength(KN)
0.6
1
1.4
1.8
2.5
3.2
4
5.5
7
Deviation rate of weight per unit area(%)
±5
Vertical and horizontal tearing strength(KN)
0.10
0.15
0.20
0.25
0.40
0.50
0.65
0.80
1.00
Width deviation rate(%)
-0.5
Thickness deviation rate(%)
±10
Vertical permeability coefficient(cm/s)
k*(0.001-0.1) Ps: k=1.0-9.9
Acid and alkali resistance(% ≥)
80
Antioxidant performance(% ≥)
80
UV resistance (% ≥)
80
Products Advantage
1) Filtration of soils in drainage applications by retaining soil particles while allowing for the free flow of water. 2) Separation and stabilization in road and railway constructions. 3) Prevention of soil movement in erosion control measures. 4) Cushioning and protection in many containment projects.
Geotextile Application
1) Water conservancy project and hydropower project.
2) Road paving, railway.
3) Airport and port.
4) River bank protection and tunnel.
5) Environmental protection, etc.
Company & Workshop
FAQ
Q:Can you send samples? A:Yes, we are very happy to provide you with free samples to check the quality of our products.
Q:Are you a manufacturer or a trading company? A:Our company located in Hefei, Anhui Province, with a registered capital of 52 million yuan. It is a professional manufacturer of geomembrane, geotextile, geogrid and other products. So we have the competitive price with best quality.
Q:Can you produce the product according to customers' requirements? A: Sure, we are professional manufacturer, OEM and ODM are both welcome.
Q:How long is the delivery time? A: General within 3-7days after received the deposit.
Q: How to control product quality? A: Our factory adopts lean management, products from the beginning to the end of the production process have strict quality control. All products must be strictly tested before packing and shipping.